一级二级三级毛片_影音先锋成人在线_午夜剧场日韩_www视频国产男人的天堂_欧美日韩精品一区二区香蕉下载_91色视频在线观看

Monitoring Warning Released by National Energy Administration Requires No New Wind Power Project Built in China’s Six Provinces and Autonomous Regions
Author: 系統管理員 Post: 2017-03-25 Hits: 【Print】 【Close】

  2017 wind power investment monitoring warning released by National Energy Administration today indicates that provinces (autonomous regions), such as Inner Mongolia, Heilongjiang, Jilin, Ningxia, Gansu and Xinjiang (including Xinjiang Production and Construction Corps), are red alert areas for the development and construction of wind power, while other provinces remain as green areas. According to the warning, provinces (autonomous regions) with red alert are not allowed to build new wind power project and are required to take effective measures to solve the problem of curtailment of wind power.

  It is required by National Energy Administration that grid enterprises should not accept new applications for wind power integration projects (including project under construction, approved project and project incorporated into the planning) of provinces (autonomous regions) with red alert, and government agencies should not issue power generation business licenses for new wind power projects to above-mentioned provinces (autonomous regions). Meanwhile, National Energy Administration decides to suspend the construction of wind power projects including Xinjiang Zhundong New Energy Base, Turpan One-hundred-kilometer Wind Zone and the second batch of projects of Jiuquan Wind Power Base, and use the running transmission channels or transmission channels in progress to store and transport the power of existing projects.

  As for provinces without red alert, it is necessary for them to control the pace of constructing wind power projects, independently determine the annual construction scale and list of projects based on the implementation of construction conditions like market demands, and coordinately consider the connection of construction and utilization in case of new situations required for curbing power use.

  It is reported by journalist that in order to effectively increase the clean energy supply in Beijing-Tianjin-Tangshan Region, National Energy Administration has required Hebei Provincial Energy Bureau to accelerate the construction of the second phase of wind power projects of Chengde Base to ensure that all projects can be accepted by grid by the end of 2017, and orderly promote the construction of the third phase of wind power projects of Zhangjiakou Base according to the construction schedule of Zhangjiakou Renewable Energy Demonstration Zone. Scattered wind power projects will no longer be built in Zhangjiakou and Chengde.

Last:
Next:

top

Far East New Materials Co., Ltd. 蘇ICP備17010580號-1 ? 2017 All rights reserved
Contact us
400-822-6908
主站蜘蛛池模板: 迭部县| 东港市| 湘西| 格尔木市| 中江县| 横峰县| 南乐县| 舟曲县| 平度市| 洱源县| 云阳县| 赞皇县| 洛阳市| 泽州县| 耒阳市| 陆良县| 昭平县| 孟连| 阿拉善盟| 盐源县| 防城港市| 彭水| 台北市| 茶陵县| 轮台县| 平江县| 井陉县| 天水市| 姚安县| 常德市| 吴川市| 房山区| 胶州市| 东方市| 湟中县| 祁阳县| 土默特右旗| 东宁县| 肃北| 汉川市| 靖远县|